Critical Path

Critical Path
Location
Washington,
Bio
Still working. Pacific NW. One daughter, age 5. Married. As long as I'm still angry about injustice I know I'm OK. The picture is from Alaska. Despite being home to various unmentionables, I think everyone in the lower 48 ought to visit at least once. Being surrounded by truly wild nature is a deeply profound and humbling experience.

MY RECENT POSTS

Critical Path's Links

Salon.com
NOVEMBER 25, 2009 11:49AM

Thanksgiving with William Burroughs

Rate: 0 Flag

pic  

 Audio Link:

http://academic.brooklyn.cuny.edu/modlang/carasi/thanksgivingprayer.mp3

 

"To John  Dillinger and hope he is still alive.
Thanksgiving Day November 28 1986"
 

Thanks for the wild turkey and
the passenger pigeons, destined
to be shat out through wholesome
American guts.


Thanks for a continent to despoil
and poison.

Thanks for Indians to provide a
modicum of challenge and
danger.

Thanks for vast herds of bison to
kill and skin leaving the
carcasses to rot.

Thanks for bounties on wolves
and coyotes.

Thanks for the American dream,
To vulgarize and to falsify until
the bare lies shine through.

Thanks for the KKK.

For nigger-killin' lawmen,
feelin' their notches.

For decent church-goin' women,
with their mean, pinched, bitter,
evil faces.

Thanks for "Kill a Queer for
Christ" stickers.

Thanks for laboratory AIDS.

Thanks for Prohibition and the
war against drugs.

Thanks for a country where
nobody's allowed to mind the
own business.

Thanks for a nation of finks.

Yes, thanks for all the
memories-- all right let's see
your arms!

You always were a headache and
you always were a bore.

Thanks for the last and greatest
betrayal of the last and greatest
of human dreams.


 

Your tags:

TIP:

Enter the amount, and click "Tip" to submit!
Recipient's email address:
Personal message (optional):

Your email address:

Comments

Type your comment below: